Fort Benning MACH

Sain provided the Civil Site Design and Permitting for a 750,000 SF Hospital, which also included an exit ramp from I-185, a 0.5 mile roadway, and separate parking structures for staff and visitors totaling 2,000 spaces. The scope of services included survey, civil layout, grading, stormwater management, erosion control, utilities, wetland permitting, and construction support. This project was designed in accordance with the latest Anti-terrorism/Force Protection Department of Defense Standards.  This project was awarded LEED Gold Certification.