CBD ITS

Sain prepared design plans for ITS deployments planned in advance of ALDOT’s project to replace the I-20/59 bridge structure between I-65 and US-31 in downtown Birmingham. Planned ITS deployments include dynamic message boards, vehicle detection systems, closed-circuit television cameras, and communication¬†infrastructure (fiber optic cable, hubs, and wireless). Sain used systems engineering to develop the design approach for the project.